Home decoration completion acceptance details are very important
|
The quality inspection institution of the decoration project shall pass the completion inspection for the owner
Family decoration is not a small project for the average family, the cost is also a lot, therefore, everyone attaches great importance to this, for fear that the quality of their home decoration is not up to standard, spent money。In order to prevent construction workers from cutting corners, many decoration owners had to "nail" the construction site。However, the average owner knows very little about the decoration, and it is difficult to find problems even if you stare at it all day, and it is impossible to check the construction quality。Hunan Baokang interior decoration quality testing center experts for everyone, analysis of family decoration completion acceptance should pay attention to the details。 Detail 1 Water and electricity renovation: kitchen, bathroom, balcony floor drain should be the lowest place on the ground, water slope should be correct, should not flood, water, water pipe water supply is smooth。After the completion of the waterway transformation, the pressure test should also be carried out to check whether there is leakage in the newly applied drainage pipe, and the water supply and drainage pipe can be covered without leakage。Lighting and socket is normal, TV, telephone signal is normal, network line is normal。Air conditioning, electric water heater, bath bar and other high-power household appliances must be independently wired to install sockets, do not connect to the lighting line。The kitchen and bathroom should be installed with anti-splash sockets, and the switch should be installed on the wall on the open side of the door。 Detail 2 Installation of sanitary ware and lamps: All kinds of sanitary ware and countertops, walls, floors and other contact parts should be sealed with silicone glue or waterproof seals。The installation of sanitary ware support and bracket should be smooth and firm, close and stable contact with sanitary ware, and metal fixed parts should be anti-corrosion treatment。The lamp installation should be firm and reliable, and each lamp fixing screw should be not less than two。When the weight of the chandelier is more than 3kg, it is strictly prohibited to install on the ceiling keel, and it is fixed by bolts or by hanging。 Detail 3 Wall floor engineering: The surface of the wall tile should be smooth, clean, consistent color, no defects。Stone, floor tile should be firmly laid, no empty drum。There should be expansion joints between bricks and bricks and between bricks and walls。Wallpaper, wall cloth, leather, plastic should be firmly pasted, the surface color is consistent, the pattern is consistent, there should be no ripples, bubbles, empty drums, cracks, warping, wrinkles, stains, glue marks and other defects。The splicing is horizontal and vertical, the distance is 1.No visible joint at 5m。The coating of wall paint and wood paint should be uniform, the paint film is consistent, and there is no wrapping edge, falling and wrinkled skin。 Detail 4 Cabinet, door, window installation: push open the door by hand, check the room door, cabinet door switch is smooth, door lock hinge is flexible and effective;Outdoor doors and Windows, especially the doors and Windows of the closed balcony, whether the seal is qualified, and whether the opening is flexible。 Detail 5 Hunan Baokang Interior decoration Quality Testing Center is the only private non-enterprise professional organization that has obtained the national quality certification qualification (CMA) of interior decoration engineering quality testing (certificate number is 2013181398R, the website of the center ishttp://g1s.klhgq8758.com/kbjczx.aspThe test report issued can be used as the basis for adjudicating decoration disputes。 The service content of Hunan Baokang Interior decoration Quality Testing Center includes: indoor waterproof engineering, sanitary appliances and pipeline installation engineering, electrical installation engineering, ceiling engineering, plastering engineering, doors and Windows engineering, light partition engineering, wall paving engineering, coating engineering, furniture making engineering, ground paving engineering quality acceptance and engineering quantity assessment。Since its establishment nine years ago in 2006, the center has accepted the commissioning of many consumers and decoration enterprises, accumulated rich experience in testing work, and provided good services for the client's decoration rights protection, which has been praised by the parties。 |
Previous post:
No more
|
Next post:
No more
|